Aging U.S. Air Force fleets have deterioration problems, resulting in increased maintenance workloads. Programmed depot maintenance (PDM) is significant, requiring 2,000 to 50,000 labor hours and material. RAND developed the PDM Capacity Assessment Tool (PDMCAT), applied it to the KC-135 PDM process, with three alternative forecasts of future workload and two fleet-size scenarios, to inform aircraft availability and resource allocation decisions.
评分
评分
评分
评分
本站所有内容均为互联网搜索引擎提供的公开搜索信息,本站不存储任何数据与内容,任何内容与数据均与本站无关,如有需要请联系相关搜索引擎包括但不限于百度,google,bing,sogou 等
© 2025 book.wenda123.org All Rights Reserved. 图书目录大全 版权所有